Dismantling of the non functioning DN 250 spiro pipe, which we replaced with a new DN 350 spiro pipe. At the same time, installation of a new DN 250 spiro branch to connect the new production line.
Dismantling of the non functioning DN 250 spiro pipe, which we replaced with a new DN 350 spiro pipe. At the same time, installation of a new DN 250 spiro branch to connect the new production line.